Electrical and ACMV instalation works of 1st, 8th, 10th & 19th sty for Hotel lobby, Café & Kitchen at Traders Orchard Gateway Hotel Singapore
ACMV System Installation Works
ACMV installation of Chillers, Cooling tower, Pumps, AHU, FCU and MV Fans. Complete with T&C and hand over of phase 1 on August 2013.
ACMV installation of Chillers, Cooling tower, Pumps, AHU, FCU and MV Fans. Complete with T&C and hand over on August 2013.
ACMV & Electrical Installation works for all Toilet upgrading works
M&E Installation Works for Smoke Free Lobby A&A works at Marriott Hotel
ACMV installation of AHU, FCU, Chilled Water Pipes and Fabric Ducting
Electrical installation of DB, Lightings and Switches
ACMV Installation of Air con ducting for SHAW THEATER
ACMV installation of Mitsubishi VRF
ACMV Duct Installation works
ACMV installation of Ducting, VAV boxes, Venturi Valves and Heater Coils (Laboratory System)
Design and Build for Electrical Installation for 4-Storey Single-User General Industrial Factory with Storage, Ancillary Office and Mezzanines and A&A to Existing Building at 457 Jln Ahmad Ibrahim, Singapore 639933 (Phase 1 & 2).
Design and Build for Electrical and Fire Alarm Installation for 2-Storey Single-User General Industrial Factory with Mezzanine and Ancillary Office on Lot 01706C MK 13 at 78 Senoko Drive.
Replacement of 22KV High Tension Switchgear At UE Square at 81 Clemenceau Aveune.
Design and Build for Electrical and Fire Alarm Installation for 2-Storey Single-User General Industrial Factory With Mezzanine and Ancillary Office.
Design, Installation, Completion and Commissioning for Level 3 (700sq-mtr) Central Kitchen Electrical Works, including alternation of existing building at 457 Jln Ahmad Ibrahim, Singapore 639933.