Current On-going Project

HH Stainless Steel @ Jurong Port Road
17 Jurong Port Road
DetailsDesign and Build for Electrical System For Proposed Erection Of A Single-User General Industrial Factory Involving Additions & Alternations To Existing Buildings With Ancillary Worker's (24 pax) Dormitory.
Year : 2024
View Details >>
Anglo Chinese School (ACS) International
61 Jalan Hitam Manis
DetailsProposed Erection Of A 12 Storey Block Comprising Of Carparks, 7 Floors Of Classrooms, Workshops And Laboratories And 2 Floors of Double-Volume Indoor Sports Halls To The Existing ACS International School.
Year : 2024
View Details >>
NTUC D'Marquee @ Downtown East
1 Pasir Ris Close
DetailsDesign and Build for Electrical Installation for Addition and Alternation to Existing Downtown East Development Involving Erection Of A Single Storey Event Space With Mezzanine on Lot 04801M MK 31 At 1 Pasir Ris Close (Pasir Ris Planning Area).
Year : 2024
View Details >>
Wilmar Food Factory @ Jalan Ahmad Ibrahim (Phase-3)
457 Jalan Ahmad Ibrahim
DetailsDesign and Build for Electrical Installation for 4-Storey Single-User General Industrial Factory with Warehouse involving A&A to Existing Building at 457 Jalan Ahmad Ibrahim, Singapore 639933 (Phase 3).
Year : 2022
View Details >>
Punggol Regional Sports and Recreation Centre
Punggol
DetailsSupply, Installation, Testing, Commissioning and Maintenance of the Air-conditioning & Mechanical Ventilation (ACMV) and Smart Facility Building Management System (SFBMS).
Year : 2021
View Details >>
Proposed A & A to SG Enable
141 Redhill Road
Details ACMV installation of Daikn VRV 4 and fabric ducting. Electrical installation for DB, Lightings and Generators.
Year : 2014
View Details >>
Terminal 1 Fixed Gangways
Changi Airport
DetailsAir-conditioning and Mechanical Ventilation System.
Year : 2017
View Details >>
Bollore (Blue Hub)
Sunview Road / Sunview Way
DetailsAir-conditioning and Mechanical Ventilation System.
Year : 2018
View Details >>
NUH Decanting
Lower Kent Ridge Road
DetailsACMV installation of FCU, MV Fans, Chilled Water Pipes and Duct Work.
Year : 2014
View Details >>
URA A&A
Maxwell Road
DetailsACMV and Electrical installation works.
Year : 2014
View Details >>
DSO Base Build Phase 2
Science Park Drive
DetailsACMV Installation of AHU, FCU, MV Fans, Chilled Water Pipes and Duct Works.
Year : 2014
View Details >>